NAPLES, Fla. (June 18, 2020) – Stevens Construction has started construction of Executive Medical Center, a 27,773-square-foot three-story addition with ambulatory surgery center and MRI, announced Mark Stevens, president, Stevens Construction, Inc.

I have to build a relationship first to answer these questions,” he said. Patients already receiving a diuretic when Accupril is initiated can develop symptomatic hypotension. It blocks the enzymes responsible for producing prostaglandins in your colon, which are the inflammatory chemicals that your immune system signals when it believes there is a threat https://farmaciasinreceta.org/cialis/. Usually, these effects are the result of prolonged administration and are generally reversible once the drug is discontinued.

Located at 4513 Executive Drive, the first floor of the addition will include medical offices, exam rooms and a new state-of-the-art MRI.  The second floor will be a completely built-out medical office space available for full-time or part-time (time-share) lease starting in March 2021. The third floor will be an AHCA-licensed Ambulatory Surgery Center (ASC) which will include two operating rooms and two procedure rooms, pre-operating and recovery for outpatient services.  The site will be expanded to accommodate the increased square footage for staff and patients along with all required site amenities, including a covered porte cochere, atrium cafe and an emergency generator for the surgery center.

Stevens Construction is building the project while the adjacent existing medical office remains occupied.

The Stevens Construction team includes project manager, Jon Zander; superintendent, JJ Slaugh and project administrator, Angie Sugg. Studio+ is the architect of record.