Project Description

Pain Management Clinic at Bonita Health Center
Size: 3,797-Square-Feet
Location: Bonita Springs
Stevens Construction’s special projects team provided a complete gut and remodel of 3,800-square-feet of existing medical offices, transforming the space into the newest location for Lee Health’s pain management services. Situated on the second floor of the 100,836-square-foot Bonita Health Center, the building remained open during construction, requiring detailed coordination to ensure safety and minimize disruption to patients and staff.
Dedicated to helping patients regain control of their lives by reducing pain and restoring function, the new clinic includes six exam rooms, a lead-lined procedure room and recovery and support areas such as nurse stations, a laboratory, clean room, private offices and restrooms. The suite also features a reception and waiting area with a dedicated check-out space to enhance patient flow and convenience. The project was delivered in six months, as scheduled.
This is the tenth interior renovation completed by Stevens Construction within the Bonita Health Center, with additional outpatient facilities under construction as part of the Lee Health continuing services contract.
The Stevens Construction team included Theo Schimper, special projects manager; Rafael Garcia Maciel, special projects superintendent; and Kelly Escorcia, special projects administrator. The project was designed by Plunkett Raysich Architects.
The Stevens Construction special projects team was launched in 2018 to focus on renovation, tenant improvement and repair projects under $1.5M. Stevens Construction provides self-performance with a team of skilled craftsmen allowing more flexibility with schedule, an ability to perform tasks on demand, quality and cost control.
















